Clients / Public Buildings Authority

BUSINESS ASSESSMENT

Luis Gutierrez Architects performed a study about the existing conditions of the building where the State Elections Commissions has its central operation facilities.

The conditions assessment of the building included site visits to observe
the structure and site, interviews with building management and maintenance personnel, and a review of available maintenance plans, design and construction documents. Repair estimates are predicated on replacing equipment and may include upgrades.

  1. Exterior facade
  2. Ponding affecting roof membrane & Affected acoustical tile
  3. Different conditions